The project required a new parking lot to be built. To start, the team cleared and grubbed the vegetation within the area of new lot and Bioswale areas. We excavated the entire new lot at a depth of 17 inches. We graded and compacted the sub grade. Placed and compacted base rock throughout the entire lot and followed up with new asphalt. We also performed concrete work through the property, work that included storm drains, curbs and gutters, sidewalks, and bio-swales.